34 – Landscaping, Plastering & much more

| 27th February 2016 | 0 Comments

Landscaping, Plastering, 2nd Fix Electrics and Carpentry

Maddomswood Oak Barn Conversion

Weeks 29 & 30…. 15th to 26th of February

 

During this fortnight much work has taken place. The plastering, carpentry and second fix electrics have nearly been completed  in the Barn and Milking Parlour and outside the Landscaping of the garden and paddock started.

 

Landscaping

John Cleary of John Cleary Fencing and Groundworks arrived on Monday the 15th to start the landscaping of the garden and also the installation of the new drive.

His Landscaping contract includes Post and Rail fencing, Close Board fencing, Paving, Lawn, Drainage, Concrete drive with Brick and grnaite set edging and the soft landscaping adjacent to all.

The following videos and photos that follow show the progress of the landscaping made across the first 2 weeks.

Landscaping

 

 

 

The connection of the foul drainage has now been made between the inspection chamber next to the barn and the chamber adjacent to the septic tank. The two surface water connections have also been made to the soak away chamber in the paddock using flexible couplers

.

Maddomswood Historic Oak Barn Conversion East Sussex - landscaping - Surface water drainage connectio

Surface water drainage connection

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping

The connection of the foul drainage to the inspection chamber next to the barn

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping

The connection fo the foul drainage to the chamber adjacent to the septic tank

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping - Oak Sleepers installed to de-mark the area of paving around the barn and balcony

Oak Sleepers have been installed to de-mark the area of paving around the barn and balcony

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping - The close board fencing being installed to soften the effect of the large brick wall adjacent to the barn

The close board fencing being installed to soften the effect of the large brick wall adjacent to the barn.

 

Daniel Dennett from DD Brickwork has returned to build the retaining wall to the front of the paving at the side of the barn.

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping - Block work was installed inline with the corner of the sheep barn and side extension

Block work was installed inline with the corner of the sheep barn and side extension

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping - The facing brickwork has nearly been finished to the retaining wall

The facing brickwork has nearly been finished to the retaining wall

 

Maddomswood Historic Oak Barn Conversion East Sussex - Landscaping - Digger being used to grade soil

John is in the digger grading the brought in soil to build up the level prior to turfing

Carpentry

 

During the 2 weeks there has been a mixture of 1st fix and 2nd fix carpentry being completed.

The oak weatherboarding has been finished around and over the large oak frame to the NW elevation:

 

Maddomswood Historic Oak Barn Conversion East Sussex - Insulation and batten placed over the large oak screen ready for the Oak Weatherboard to be fixed

Insulation and batten placed over the large oak screen ready for the Oak Weatherboard to be fixed

 

Maddomswood Historic Oak Barn Conversion East Sussex -The oak weatherboard has been fixed over the large oak screen to close the eaves

The oak weatherboard has been fixed over the large oak screen to close the eaves

 

The Oak plates have been fixed down to the block work below using re-bar and a resin bonding adhesive. Once the resin has set oak plugs will be inserted into the hole and left proud.

 

Maddomswood Historic Oak Barn Conversion East Sussex - R-bar in pre-drilled hole ready to be hammered down through the resin

R-bar in pre-drilled hole ready to be hammered down through the resin

 

Work has started on the storage solutions in the bedrooms. (There will also be a cupboard built to the side of the Bi-folding doors and a book case scenario over the Kitchen main feature beam. Pictures of these will be in the next post.)

 

Maddomswood Historic Oak Barn Conversion East Sussex - The frame for the wardrobe in bedroom 4 has been installed

The frame for the wardrobe in bedroom 4 has been installed

 

Maddomswood Historic Oak Barn Conversion East Sussex - The doors for the wardrobes have been cut to size and edged.

The doors for the wardrobes have been cut to size and edged.

 

Maddomswood Historic Oak Barn Conversion East Sussex - The doors for the wardrobes have been grooved using a router

The doors for the wardrobes have been grooved using a router

 

Flu Installation

 

The Flu serving the wood burner has been installed. The contractor needs to return as the tiling has not been completed to my satisfaction on the barn hip and also the internal plate still has the manufacturers sticker on it and the timber blocks need cutting back.

 

Maddomswood Historic Oak Barn Conversion East Sussex - The Flu for the wood burning fire being installed using a tower

The Flu for the wood burning fire being installed using a tower

 

Maddomswood Historic Oak Barn Conversion East Sussex - The contractor used a Cherry Picker to install the flu through the barn hip

The contractor used a Cherry Picker to install the flu through the barn hip

 

Maddomswood Historic Oak Barn Conversion East Sussex - The contractor used a Cherry Picker to install the flu through the barn hip

The contractor used a Cherry Picker to install the flu through the barn hip

 

Maddomswood Historic Oak Barn Conversion East Sussex - Flu installation...sticker still in place and blocks showing

Flu installation…sticker still in place!! and blocks showing…we will be replacing with an oak trim

 

Maddomswood Historic Oak Barn Conversion East Sussex - The flu through the barn hip

The flu through the barn hip

 

Insulation and Plastering

Colin has been assisting Adam and Steve of S & A Plastering and Building with the installation of the insulation prior to boarding.

Steve and Adam are working very hard to complete the plastering by the end of the 2nd week leaving only bits to do and a clean up of the beams.

Steve and Adam are always first to arrive and last to leave. I highly recommend them to anybody looking for a quality plastering job completed by two lovely blokes.

 

 

Maddomswood Historic Oak Barn Conversion East Sussex - The tile backer has been installed in the shower of the master bedroom including a recess/shelf

The tile backer has been installed in the shower of the master bedroom including a recess/shelf

 

Second Fix Electrics

Paul and Dorian from Electricare Ltd have made a start on the 2nd fix electrics. The start with locating the down-light feeds in the kitchen and hall ceiling. Dorian used a lazer to mark the locations on the ceiling. He made himself a bit too comfortable it appears……

 

Maddomswood Historic Oak Barn Conversion East Sussex - Dorian and Paul from Electricare Ltd....using a lazer to mark the locations of the down lights in the kitchen

Dorian (on the floor) and Paul from Electricare Ltd…. a lazer is used to mark the locations of the down lights in the kitchen. Lying on the floor to do this is perfectly normal! Paul looks on…a penny for his thoughts.

Click here to go to the next post in the series

Maddomswood Oak Barn Conversion

Landscaping, Plastering, 2nd Fix Electrics and Carpentry

Tags: , , , , ,

Category: Construction Phase, Maddomswood Barn, My Projects, Property Developing