36 – V4 Oak Flooring, Concrete Drive, Stone Floor & Re-Pointing

36 – V4 Oak Flooring, Concrete Drive, Stone Floor & Re-Pointing

| 28th March 2016 | 0 Comments

V4 Oak Flooring, Concrete Drive, Stone Floor & Re-Pointing Maddomswood Oak Barn Conversion Weeks 33 and 34 – 14th March to the 25th March   Good progress has been made over the last two weeks. The Concrete Drive has been installed, The V4 Oak Flooring and Cotswold Stone floor has been laid, the Re-Pointing and Brick Repairs […]

Continue Reading

35 – Landscaping, Plastering, Carpentry

35 – Landscaping, Plastering, Carpentry

| 13th March 2016 | 0 Comments

Landscaping, Plastering, Carpentry & Decorating Maddomswood Oak Barn Conversion Weeks 31 and 32 – 29th February to the 11th March   As any project draws to a close there is always a lot of activity such as 2nd fix carpentry/plumbing/electrics, but progress can appear slow. The lumpy bits like brickwork, Oak structure, 1st fix carpentry have all […]

Continue Reading