Tag: brickwork

26 – Barn Conversion – Week 20 – part 2

26 – Barn Conversion – Week 20 – part 2

| 3rd December 2015 | 0 Comments

Week 20 – 30th November to – 4th of December Part 2 – Wednesday, Thursday and Friday Barn  Conversion Wednesday The barn conversion continues…..The roofers weren’t on site today…they had to finish another job. This is fine. They are on a price and as long as they finish boarding the roof by the end of the […]

Continue Reading

Crouch Cottage – Grade 2 Listed Cottages – Wadhurst

Crouch Cottage – Grade 2 Listed Cottages – Wadhurst

| 26th November 2015 | 0 Comments

Conversion of Two Grade 2 listed cottages with no mod cons into one 4 bedroom house with a 6 x 4 kitchen extension These grade 2 listed cottages came onto the market when we were not ready to purchase so with regret we set aside the advert. This type of project is rare and getting rarer all […]

Continue Reading

23 – Barn Conversion – Week 18

23 – Barn Conversion – Week 18

| 16th November 2015 | 0 Comments

Week 18 – 16th – 20th of November Barn Conversion Monday I arrived at 7.00am this morning to make final preparations for the concrete pour for the barn slab. The over site had been prepared but there were some dips that needed to be filled with broken tiles. NOTE: Concrete costs a lot of money. The rate I was paying […]

Continue Reading

19 – Barn Conversion – Week 15

19 – Barn Conversion – Week 15

| 29th October 2015 | 0 Comments

Week 15 – 26th to 30th October Barn Conversion – Summary of Monday through Friday   On Monday and part of Tuesday Andy and Joe installed the last timbers in the West End gable and barn hip. As you will have seen from previous pictures the gable end had been mucked about with over the […]

Continue Reading

14 – Barn Conversion – Week 10

14 – Barn Conversion – Week 10

| 12th October 2015 | 0 Comments

Maddomswood Barn Conversion Week 10 – 21st – 25th September Monday We arrived this morning to find the trenches we had dug full of water. And it was still raining. The concrete was due to arrive at 2pm so we finished the mesh to the oversite and I went to Jewsons to hire a pump […]

Continue Reading

12 – Barn Conversion – Week 8

12 – Barn Conversion – Week 8

| 12th October 2015 | 0 Comments

Maddomswood Barn Conversion Week 8 – 7th – 11th September Monday On Monday Dan and Leon start by installing the profile again for the corner. Dan uses a folding large square to ensure the corner is set at 90 degrees.     NOTE: I had a good chat this morning with Dan as to what […]

Continue Reading